Be ready before the line is hit.
An emergency pipeline repair system (EPRS) is the plan, equipment, procedures and people that let an operator repair a damaged pipeline quickly and safely. We help you set one up, keep it ready and use it when it matters.
pillars of readiness
steps in the readiness cycle
service lines
plan, agreed before damage happens
See readiness at a glance
The kind of view a well-kept repair system gives you: what is defined, specified, stored and practised.
Damage scenarios defined
Equipment specified
Spares inspected
Procedures drilled
Figures are illustrative only, to show the dashboard format. They do not describe any operator or project.
When damage happens, a clear sequence
Detect
Damage or loss of containment is identified and reported.
Make safe
The line is isolated and depressurised and the area made safe.
Assess
Survey locates and describes the damage; the pre-planned scenario is matched.
Mobilise
Stored repair equipment, people and vessels are mobilised under the agreed plan.
Repair
The pre-qualified repair method is applied following approved procedures.
Restore
The line is tested, returned to service and lessons are fed back.
Typical sequence. Use arrow keys to move between steps.
When a pipeline is damaged, every hour counts
Anchors, dropped objects, corrosion and seabed movement can all damage a line. Without a ready system, finding the right equipment, procedures and people can take far longer than the repair itself.
Unplanned damage
Third-party impact, corrosion and geohazards strike without warning.
Equipment not ready
Repair tools specified late, stored badly or missing spares.
Procedures out of date
Plans that nobody has drilled lose value fast.
Long downtime
Every day offline costs production and raises risk.
Four things, always in place
Know your risks
Credible damage scenarios defined for each pipeline.
Right equipment
Repair methods chosen and equipment specified before it is needed.
Kept ready
Spares stored, preserved, maintained and tracked.
Practised response
Mobilisation plans and drills kept current.
Reactive
- Search for compatible repair equipment after the event
- Write procedures under pressure
- Source people and vessels from scratch
Ready
- Equipment specified, stored and inspected
- Procedures approved and drilled
- Mobilisation plan agreed in advance
Damage is unplanned. Readiness should not be.